Please use this identifier to cite or link to this item: http://ir.library.ui.edu.ng/handle/123456789/1815
Full metadata record
DC FieldValueLanguage
dc.contributor.authorIsmail, O. S.-
dc.contributor.authorAjide, O.O-
dc.contributor.authorAkingbesote, F.-
dc.date.accessioned2018-10-10T15:18:03Z-
dc.date.available2018-10-10T15:18:03Z-
dc.date.issued2012-
dc.identifier.issn1947-3818-
dc.identifier.otherEngineering 4, pp. 453-458-
dc.identifier.otherui_art_ismail_performance_2012_08-
dc.identifier.urihttp://ir.library.ui.edu.ng/handle/123456789/1815-
dc.description.abstractSolar Photovoltaic (PV) can be considered as one of the most reliable and promising renewable systems. This is of great importance for developing countries like Nigeria especially in the rural communities where there is little or no access to electricity. The use of solar energy will no doubt contribute to the improvement of the living conditions of these villagers. Solar PV systems have been installed in some villages in Nigeria but unfortunately, the expected benefits from using these systems have been jeopardized. The objective of this work is to embark on performance assessments of installed Solar PV system in Oke-Agunla, Akure local government of Ondo State in Nigeria. Visits were conducted to the village; equipments on ground were examined while the people were interviewed. Both functional and non-functional facilities were traced to their manufacturers using the identification data on them and rated to ensure their efficiencies. Energy demands were also prorated, and observed the need to improve on the present energy supplied. Results of the assessments shows that PV facilities used were inadequate, trained technicians were not available giving room for quacks working on the facilities occasionally resulted in further complications and poor facilities maintenance. The assessment result shows that just 14.52% of the 4.5 kW installed solar PV was utilized due to significant malfunctioning and deterioration in performance. It can be concluded from this study that the installed solar PV systems was inefficient as a result of poor maintenance, lack of technical know-how and inability of the project contractors or managers to take these factors into consideration while embarking on the solar PV installations.en_US
dc.language.isoen_USen_US
dc.publisherScientific Researchen_US
dc.subjectSolar PV;en_US
dc.subjectInstallations;en_US
dc.subjectOke-Agunla;en_US
dc.subjectEnergy Supply;en_US
dc.subjectAssessmenten_US
dc.subjectDeteriorationen_US
dc.titlePerformace assessment of installed solar PV system: a case study of Oke-Agunla in Nigeriaen_US
dc.typeArticleen_US
Appears in Collections:scholarly works

Files in This Item:
File Description SizeFormat 
(4)ui_art_ismail_performance_2012(12).pdf346.21 kBAdobe PDFThumbnail
View/Open


Items in UISpace are protected by copyright, with all rights reserved, unless otherwise indicated.