Search
Add filters:
Use filters to refine the search results.
Results 1-1 of 1 (Search time: 0.001 seconds).
- previous
- 1
- next
Item hits:
Issue Date | Title | Author(s) |
---|---|---|
2011 | Design and construction of a 5kW turbine for a proposed micro hydroelectric power plant installation at Awba dam University of Ibadan | Ajuwape, T.; Ismail, O. S. |
Discover
Subject