Search


Current filters:

Start a new search
Add filters:

Use filters to refine the search results.


Results 1-10 of 12 (Search time: 0.004 seconds).
Item hits:
Issue DateTitleAuthor(s)
2011Harmonious song-list generation: anapplication of the sequence dependent machine set up time problem modelOladokun, V. O.; Charles-Owaba, O. E.; Nzeribe, T. M. C.
2012Demand management based design of residential solar power supply system: a techno-economic evaluationOladokun, V. O.; Adeshinyan, S. A.
2011Finishing and aesthetic capabilities of Nigerian metal fabrication companies:case study of Ibadan, southwest, NigeriaOladokun, V. O.; Adeboyejo, A. A.
2011A bi-criteria algorithm for the simultaneous minimization of makespan and number of tardy jobs on a single machine with sequence dependent set-up timeOladokun, V. O.; Chalres-Owaba, O. E.; Olaosebikan, F. O.
2011Finishing and aesthetic capabilities of Nigerian metal fabrication companies:case study of Ibadan, southwest, NigeriaOladokun, V. O.; Adeboyejo, A. A.
2012-05Development of a materials requirement planning(MRP) softwareOladokun, V. O.; Olaitan, A. O.
2012Application of fuzzy logic to the optimal location of public utilities: a case study of pedestrian bridges.Oladokun, V. O.; Okesiji, O. O
2011A framework for local production of a low cost plastic injection mould systemOladokun, V. O.; Rabiu, K. O.
2011An assessment of the manufacturing capabilities of Nigerian funiture makers: case study of Lagos, NigeriaOladokun, V. O.; Ojo, A. O.; Sunmonu, S. O.
2020The traveling salesman problem: algorithms, sub-tours and applications in combinatorial optimizationOladokun, V. O.; Odedairo, B. O.; Atitebi, O. S.