Please use this identifier to cite or link to this item:
http://ir.library.ui.edu.ng/handle/123456789/1840
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Odior, A. O. | - |
dc.contributor.author | Oyawale, F. A. | - |
dc.contributor.author | Ovuworie, G. C. | - |
dc.date.accessioned | 2018-10-11T07:47:30Z | - |
dc.date.available | 2018-10-11T07:47:30Z | - |
dc.date.issued | 2010 | - |
dc.identifier.issn | 2153-649X | - |
dc.identifier.other | American Journal of Scientific and Industrial Research 1(3), pp. 636-642 | - |
dc.identifier.other | ui_art_odior_some_2010 | - |
dc.identifier.uri | http://ir.library.ui.edu.ng/handle/123456789/1840 | - |
dc.description.abstract | The Power Holding Company of Nigeria (PHCN) is responsible for generating, transmitting, distributing and selling electric power to the various consumers throughout the country. The paper presents the results of an investigation conducted on some of the operations of Power Holding Company of Nigeria (PHCN) to determine some of the major factors affecting the availability of power supply to consumers in Benin City area of Nigeria. The average number of operating transformers in various substations and their percentage loadings were also studied. It was discovered that the average power supply to Government Reservation Area (GRA) was more regular and stable than that of Siluko area of Benin City. | en_US |
dc.language.iso | en | en_US |
dc.publisher | Science Hub | en_US |
dc.title | Some operations of electric power supply system in Benin City area of Nigeria | en_US |
dc.type | Article | en_US |
Appears in Collections: | scholarly works |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
26.ui_art_odior_some_2010(54).pdf | 541.57 kB | Adobe PDF | View/Open |
Items in UISpace are protected by copyright, with all rights reserved, unless otherwise indicated.